Links of Interest

NM Regulation and Licensing

International Code Council

NM Board of Examiners

NM State Board of Licensure

Building Codes

Permit Applications and Fees

Building Permit Application

Electrical Permit Application

Mechanical/Plumbing Permit Application (Both Residential and Commercial)

Manufactured Home Placement Permit Application

Xcel Energy New Electric Service

Misc

Building permit Fee Schedule

Commercial Plan Review Application

Building Inspections Checklist

ADA Compliance Form

Engineering Checklist

Fire Checklist

Utilities Checklist

City Ordinance

Permit Requirements

Commercial Permit Requirements

Residential Permit Requirements

Reports

July 2014

August 2014

September 2014

October 2014

November 2014


Building Inspections

Building Inspections is a unit of the General Services Department. This department is responsible for:

General building electrical, mechanical plumbing permits for commercial and residential.

Plan Reviews for all construction, including but not limited to, commercial, residential, remodeling, alterations and repairs.

Regulating City and State Building codes.

Conducting Building Inspections during construction to assure compliance of City and State Building Codes.

The Permit Process

The building permit process helps us understand what our local laws and ordinances are. Before any construction or remodeling work begins, application for a permit should be made.

Building permits provide the mean for Code Officials to inspect construction to ensure that minimum standards are met and appropriate materials are used.

  1. Visit or Call Your Local Code Official
    The Code Official will ask "What are you planning to do?" and "Where are you planning to do it?" Then, the Code official will explain the requirements (codes/ordinances) regarding your project.  An application for a building permit will be given to you at this time. This initial contact will provide the resources and information you will need to make your project a success and avoid problems which could cost you time and money.

  2. Submit Application
    The permit application requires information about the construction project.  You'll be asked to document "who" will perform the work, "what" work will be done, "where" the work will be done, "when" the work will be done and "how" the work will be done.  Sketches, drawings, plans or other documentation of the proposed work will have to be submitted for review.

  3. Wait During Review Process
    The majority of residential permit applications are processed without delay and commercial permits are processed 1-10 working days (depending on information submitted.) The Code Official will determine if your project is in compliance with the construction codes, with the fire zoning and with municipal or state ordinances and statues.

  4. Receive Results Of Review Process
    A.  If compliance with the City Code, and other applicable regulations is determined, the application is approved and a permit issued.
    B.  If compliance is not determined, your application as submitted will be denied. If you are refused a building permit, you can correct the code violations or appeal the decision or re-submit with corrections. 

  5. Receive Permit
    The building permit is the document granting legal permission to start construction. You must proceed as approved in the review process and on-site inspection process. The fee also gives you access to the Code Official's knowledge and experience when and if you  have questions about your construction project. An additional fee for services such as water connections and surveys may be required. Inspections required for your project will be indicated on the permit. Most building departments require you post the building permit in a window or other prominent place at the construction site, keep a copy of the building plans at the site, and bring any proposed changes to the attention of the code official immediately.  Changes will require a review and approval in the same manner as the original application.

  6. Arrange Inspection Visit
    Each major phase of construction must be inspected by the Code Official to make certain the work conforms to the code, the building permit and the approved plans. The person responsible for the construction project must request each inspection. Normally, 24 to 48 hours advance notice is required. If an inspector finds that some work does not conform to approved plans, the inspector will advise (and possibly provide written notice) that the situation is to be remedied. If the violation is serious, a stop work order may be posted until the problem is resolved. 

  7. Receive Certificate Of Occupancy
    When code compliance is determined, the Inspector issues a certificate of occupancy. This certificate is the formal document which marks the completion of your construction project and gives you permission to occupy your new or renovated building with the knowledge that it has met safety standards in your community.

Building Permits - Why and How?

What is a Building Permit?
A building permit is a license which grants legal permission to start construction of a building project

What Construction Projects Need Building Permits?
Check your local building department for requirements in your area. Building permits are typically required for the following:

  • New Buildings

  • Additions

  • Alterations/Remodels

  • Demolitions

  • Prefabricated Structures

  • Temporary Buildings

  • Manufactured Homes

  • Re-roof

  • Electrical Systems

  • Plumbing Systems

  • HVAC Systems (heating, ventilating, air conditioning)

  • Miscellaneous for residential (fireplace, pools, decks, fences, curb cuts, etc.)

  • Miscellaneous for commercial (parking, sidewalks, curb cuts, etc.)

 

The Use of Permits
Code Officials and Inspectors use building permits as a vital step in their enforcement of codes.  You have an investment in the home or business  you are about to build or remodel.  When that home or business does not comply with the codes, you investment could be reduced.  Applying for a building permit notifies the Code Official that you are constructing or remodeling a building so he or she can ensure code compliance.

Why a Building Permit?
Building permits provide the means for Code Officials to protect us by reducing the potential hazards of unsafe construction and therefore ensuring the public health, safety and welfare.

Manny Marquez
Building Official


Mailing Address
200 E Broadway
Hobbs, NM 88240

Physical Address
200 E Broadway
Hobbs, NM 88240

mmarquez@hobbsnm.org

Building Inspection Department

Phone: (575) 397-9234
Fax: (575) 391-3061


Allen Garrison
Building Inspector


agarrison@hobbsnm.org

(575) 397-9376
Fax: (575) 391-3061

(575) 391-4154
Fax (575) 391-3061

 

Ed Sloman
Electrical Inspector

esloman@hobbsnm.org

Phone: (575) 391-8158

 

What's New

Ordinance 1079 - Water and Sewer Rates

[Click here] to read the changes

 

News about Hobbs

Click [here] to visit our News page.

 

Quality of life master Plan

Click the link below to download the PDF.

Quality of Life Master Plan

 

Public Meetings

Click the link below to download the agenda:

Planning Board Meeting Agenda, December 16, 2014

Planning Board Meeting Agenda, December 16, 2014 [Full Packet]

City Commission Meeting Agenda, December 15, 2014

City Commission Meeting Agenda, December 15, 2014 [Full packet]

Library Board Meeting Agenda, December 2, 2014

City Commission Meeting Agenda, Dec. 1, 2014

City Commission Meeting Agenda, Dec. 1, 2014 [Full Packet]

 

New Legal Notices

The Legal Notices page has been updated with new information.

 

Web Page Additions or Updates

Animal Adoption Center

Flood Hazard Awareness

Municipal Code

Documents Online

Business Services

News Articles

Press Releases